Ultimate magazine theme for WordPress.

Exclusive: Boeing 737 MAX development marred by design,

[ad_1]


© Reuters. FILE PHOTO: A Boeing 737 MAX airplane lands after a test flight at Boeing Field in Seattle

By David Shepardson, Eric M. Johnson and Tracy Rucinski

WASHINGTON/SEATTLE/CHICAGO (Reuters) – Boeing Co (N:) failed to submit certification documents to the U.S. Federal Aviation Administration (FAA) detailing changes to a key flight control system faulted in two fatal crashes, a long-awaited government report seen by Reuters has found.

The flight control system, known as MCAS, was “not an area of emphasis” because Boeing presented it to the FAA as a modification of the jet’s existing speed trim system, with limited range and use, according to the report.

The 52-page report by the U.S. Department of Transportation’s Office of Inspector General, dated June 29 and set to be made public Wednesday, laid bare mistakes made by both the planemaker and FAA in the development and certification of Boeing’s top-selling aircraft.

It is the latest of reports faulting the plane’s approval, while the Justice Department has an ongoing criminal investigation.

In January, Boeing released hundreds of internal messages that contained harshly critical comments about the development of the 737 MAX, including one that said the plane was “designed by clowns who in turn are supervised by monkeys.”

The 737 MAX has been grounded from commercial flight worldwide since March 2019 after two crashes killed 346 people in Ethiopia and Indonesia over a five-month span.

Boeing’s so-called MCAS stall-prevention system has been faulted in both crashes, when the system repeatedly and forcefully pushed down the jet’s nose as pilots struggled to intervene. Crash investigators have pinpointed a cocktail of other factors.

The inspector general report details activities from the beginning of certification in January 2012 through the second crash and details allegations of “undue pressure” on Boeing employees. The IG’s office will issue recommendations to the FAA later this year, the Transportation Department said in comments about the draft report submitted on June 8.

Disclaimer: Fusion Media would like to remind you that the data contained in this website is not necessarily real-time nor accurate. All CFDs (stocks, indexes, futures) and Forex prices are not provided by exchanges but rather by market makers, and so prices may not be accurate and may differ from the actual market price, meaning prices are indicative and not appropriate for trading purposes. Therefore Fusion Media doesn`t bear any responsibility for any trading losses you might incur as a result of using this data.

Fusion Media or anyone involved with Fusion Media will not accept any liability for loss or damage as a result of reliance on the information including data, quotes, charts and buy/sell signals contained within this website. Please be fully informed regarding the risks and costs associated with trading the financial markets, it is one of the…

[ad_2]

Read More: Exclusive: Boeing 737 MAX development marred by design,